Actualidade » Notícias da Empresa » The 50t Converter of GUSA Installed into Position Smoothly
The 50t Converter of GUSA Installed into Position Smoothly
2011-03-11 10:46:09
The 50t Converter of GUSA Installed into Position Smoothly
The Converter Installed into Position
The 50t Converter of GUSA Installed into Position Smoothly

Since CISDI was awarded a 50t converter contract by GUSA, Brazil in July, 2008, the project is going well. The 50t converter adopted self-developed proprietary CISDI-SACS bottom-suspension technology including converter bottom-suspension system, converter bearing supporting system and tilting driving system. 

On February 25, 2010, the constructors pulled the converter shell, ring, supporting ladle car and slag tank car (totally weighing 200t) into prepared position that indicated the 50t converter of GUSA was installed into position and created good condition for follow-up installation work.
 
Due to the project location is in rainy season, frequent heavy rain brought a lot of inconvenience, seriously affecting construction period with the client’s anxiety; in order to ensure the converter are ready, CISDI SV actively strengthen the communication with owner, construction and supervision parties, aiming at solving problems during installation period and put forward series of feasible proposals for client. The hard-working and great effort made by CISDI on-site SV was affirmed by Mr. Luis Alberto Ferreira (Client Representative), he once said: “CISDI could handle with the troublesome problems timely, CISDI on-site SV are good”
 
At present, the plant steel structure work is proceeding fast under the unified arrangement of client.
Início | Sobre CISDI | Actualidade | Produtos | R&D | Carreira | Medios de comunicação | Contato
Endereço: No.1 Shuanggang Road, Yuzhong District, Chongqing 400013, China.  Código Postal: 400013
Copyright by CISDI Group @ 2010